In SCHMITEC, we are committed to excel in providing our customers with the best solutions technically, commercially, humanly and environmentally. With a reputable, strong and ever-growing team, SCHMITEC provides a competitive quality out of the needs in engineering solutions and services in the oil and gas industry.
CLIENT | OWNER | STRUCTURE AND SERVICE | YEAR |
ENPPI | SAUDI ARAMCO | CMP Upgrade Desalination Water Treatment Plant-Safaniah (MFR NO. 3949-200-199-06-Q) | 2019 |
HESS | HESS | Provision Of Wellview Software System And Maintenance Support | 2019 |
JX NIPPON (NOMA) | JX NIPPON (NOMA) | Implementation For Wellview Software | 2019 |
ABS Malaysia | CPOC | Pipeline Corrosion Assessment For CPOC RBI Project | 2019 |
Sapura Energy | HESS | Provision Of Integrity Critical Equipment (Ice) Register Services | 2018 |
MDC Oil & Gas | MDC Oil & Gas | Provision Of Peloton Software Maintenance Renewal And Support Services For MDC Oil & Gas (SK320) Ltd. | 2018 |
VESTIGO | VESTIGO | Provision Of Peloton Software, Maintenance, Training And Support Services For VESTIGO PETROLEUM SDN. BHD. | 2018 |
KBR-AMCDE | SAUDI ARAMCO | Corrosion Management Program (CMP) for Shedgum Gas Plant-Install Steam Turbine | 2018 |
PCSB | PCSB | Technical Studies for Samalaju Gas Supply Project – Planned Scheduled Maintenance Update (CMMS) | 2018 |
PCSB | PCSB | NC3 Full Well Stream – Planned Scheduled Maintenance Update (CMMS) | 2018 |
PCSB | PCSB | Provision Of Peloton Software, Maintenance, Training And Support Services For Petronas Carigali Sdn Bhd | 2018 |
ENPPI | SAUDI ARAMCO | Corrosion Management Program for ENPPI/Saudi Aramco’s Sulfate Removal Facilities at Ain Dar | 2018 |
TechnipFMC | TechnipFMC | Provision Of Independent Verification Body (Ivb) Services For Roc Oil D35 Pipeline Epcic Project | 2018 |
Bureau Veritas | PCSB | Lead Material & Corrosion Engineer for CDBM Kinarut – Erb West Compressor Upgrading project | 2018 |
Expro Oilfield | PCSB | Corrosion Assessment Study For Early Production System (EPS) Package For SEPAT 2A | 2018 |
Pyramid Oil and Gas | PCSB | Provision Of Engineering Design For Novel Offshore Sand Disposal System (NOSDS) Project – Material Selection for Sand Washing System | 2017 |
Technip FMC | Murphy | Independent Verification Body for Block H Gas Development Project Phase 1A | 2017 |
PRW | PCSB | Corrosion Design Basis Memorandum for D18 Phase 2 Project | 2017 |
PRW | PCSB | Corrosion Design Basis Memorandum for D12 and D35 Oil Development Project | 2017 |
Armada TPCE | PCSB | Provision of Constructability Review For D35 HVAC System Upgrade (Post AFC) | 2017 |