Hi, How Can We Help You?

Projects

In SCHMITEC, we are committed to excel in providing our customers with the best solutions technically, commercially, humanly and environmentally. With a reputable, strong and ever-growing team, SCHMITEC provides a competitive quality out of the needs in engineering solutions and services in the oil and gas industry.

CLIENT OWNER STRUCTURE AND SERVICE YEAR
RNZ Integrated PCSB Hazop Study for Workover Campaign BODP-C 2013
RNZ Integrated PCSB Corrosion Design Basis Memorandum for Greater D18 Project (Pre-FEED) 2013
RNZ Integrated PCSB HAZOP & HAZID for Greater D18 Project (Pre-FEED) 2013
MMC Oil & Gas PCSB HAZOP & HAZID for Temana Revisit Project 2013
RNZ Integrated PC(T)SB Corrosion Management Plan for West Diyarbekir Project, Turkmenistan 2013
MMC Oil & Gas PCSB HAZID Study for Angsi facilities Upgrading Project (AFUP) Booster Compression Module 2012
RNZ Integrated PC(T)SB Corrosion Management Plan for Central Diyarbekir Project, Turkmenistan 2012
MMC Oil & Gas PCSB HAZID Study for Angsi Booster Project 2012
RNZ Integrated PCSB HAZOP Study for Besar Development Project 2012
MMC Oil & Gas PCSB Asset Integrity Assessment On Existing Topsides And Pipelines Affected By Angsi CEOR –(FEED) 2012
MMC Oil & Gas PCSB Corrosion Design Basis Memorandum (CDBM) for Angsi CEOR Host Tie-In – (FEED) 2012
MMC Oil & Gas PCSB Corrosion Design Basis Memorandum (CDBM) for Angsi CEOR Floater – (FEED) 2012
MMC Oil & Gas PCSB CorrosionStudyReportOnExistingPipelineAndTopside(Addendum)for Angsi– (CONCEPTUAL) 2011
MMC Oil & Gas PCSB Corrosion Design Basis Memorandum (CDBM) for Angsi CEORFlexible Pipeline(CONCEPTUAL) 2011
MMC Oil & Gas PCSB Corrosion Design Basis Memorandum (CDBM) for Angsi CEOR Floater – (CONCEPTUAL) 2011
OPE (M) Sdn Bhd PCSB Corrosion Management Plan (CMP) for PCSB SKO Pipeline Rejuvenation Project. 2011
OPE (M) Sdn Bhd PCSB Corrosion Design Basis Memorandum (CDBM) for PCSB SKO Pipeline Rejuvenation Project. 2011
MMC Oil & Gas PCSB Corrosion Design Basis Memorandum (CDBM) for D21 Post-FEED 2011
RNZ Integrated PCSB Corrosion Design Basis Memorandum (CDBM) for Kinabalu Phase II Project 2010
CPOC CPOC Corrosion-Erosion Inspection for Sand-prone piping and cooling water piping. 2010

1 | 2 | 3 | 4 | 5