In SCHMITEC, we are committed to excel in providing our customers with the best solutions technically, commercially, humanly and environmentally. With a reputable, strong and ever-growing team, SCHMITEC provides a competitive quality out of the needs in engineering solutions and services in the oil and gas industry.
CLIENT | OWNER | STRUCTURE AND SERVICE | YEAR |
PRW | PCSB | Corrosion Design Basis Memorandum for D12 and D35 Oil Development Project | 2017 |
Armada TPCE | PCSB | Provision of Constructability Review For D35 HVAC System Upgrade (Post AFC) | 2017 |
Somnez Alaw | PC(T)SB | Provision of Condition Based Monitoring Services PETRONAS Carigali Turkmenistan Sdn Bhd | 2017 |
Somnez Alaw | PC(T)SB | Provision for Mechanical Rotating Maintenance Services for PETRONAS Carigali (Turkmenistan) Sdn Bhd. | 2017 |
Mutiara Etnik | UEM | Project Safety Review for Additional Line Kamunting Incinerator Plant (KIP3) | 2017 |
Mutiara Etnik | UEM | SIL Study for Additional Line Kamunting Incinerator Plant (KIP3) | 2017 |
Mutiara Etnik | UEM | Hazardous Area Classification for Additional Line Kamunting Incinerator Plant (KIP3) | 2017 |
Mutiara Etnik | UEM | HAZOP and HAZID for Additional Line Kamunting Incinerator Plant (KIP3) | 2017 |
Technip FMC | Murphy | Independent Verification Body for KIKEH DRY TREE UNIT GAS LIFT EPCIC CONTRACT | 2017 |
PRW | PCSB | Corrosion Management Plan (CMP) for F12 JT-A Topside Facilities and Jacket | 2017 |
PRW | PCSB | Corrosion Management Plan (CMP) For F9 JT-A Host Tie-In (HTI) and Modification | 2017 |
PRW | PCSB | Corrosion Management Plan (CMP) for Samarang Redevelopment Project Phase 2 EOR | 2017 |
APS Malaysia | PCSB | HAZOP and HAZID Study for Rehabilitation Pipelines IFL Project at Bayan Platforms | 2016 |
MMC Oil & Gas | TALISMAN | Corrosion Adequacy Check for Bunga Raya A/B Oil Production System Post LP Gas Well Tie- In | 2016 |
Armada TPCE | PCSB | HAZID and Constructability Review for Metering Analyser System of Betty (BEPA), Bokor (BOPA) And Tukau (TKPA) Water-Cut Measurement Improvement | 2016 |
APS Malaysia | PCSB | HAZOP and HAZID Study for Rehabilitation Pipelines IFL Project at Bokor, Baram and Tukau Platforms | 2016 |
MMC Oil & Gas | PCSB | HAZOP and HAZID Study for SBGAST New Power Generation System | 2015 |
RNZ Integrated | PCSB | HAZOP of J4DP-A Well To Well Gas Lift Facility Installation Project | 2015 |
MMC Oil & Gas | TALISMAN | CDBM of New well Tie-Ins and well Conversion on Bunga Orkid-D Project | 2015 |
ILK Construction | PC(T)SB | CMP & RBI Study for Garagol Deniz West Project | 2015 |