In SCHMITEC, we are committed to excel in providing our customers with the best solutions technically, commercially, humanly and environmentally. With a reputable, strong and ever-growing team, SCHMITEC provides a competitive quality out of the needs in engineering solutions and services in the oil and gas industry.
CLIENT | OWNER | STRUCTURE AND SERVICE | YEAR |
RNZ Integrated | PCSB | Hazard Identification (HAZID) Study for Kasawari Project | 2014 |
RNZ Integrated | PCSB | HAZOP Study for Kasawari Project | 2014 |
RNZ Integrated | PCSB | Thermal Radiation, Gas Dispersion and Plume Study for Kasawari Project | 2014 |
RNZ Integrated | PCSB | Escape, Evacuation and Rescue Analysis (EERA) for Kasawari roject | 2014 |
RNZ Integrated | PCSB | Emergency System Survivability Analysis (ESSA) for Kasawari Project | 2014 |
RNZ Integrated | PCSB | Human Factors Engineering (HFE) Study for Kasawari Project | 2014 |
RNZ Integrated | PCSB | Design HSE Case for Kasawari Project | 2014 |
RNZ Integrated | PCSB | Corrosion Design Basis Memorandum for Gas Blending Facility | 2014 |
Mustang Engineering | PCSB | Preliminary Material Selection Study for Irong Project | 2014 |
Mustang Engineering | PCSB | Concept Select HSE Case for Irong Project | 2014 |
Mustang Engineering | PCSB | Hazard Identification (HAZID) Study (Conceptual) for Irong Project | 2014 |
Mustang Engineering | PCSB | HSE & Fire Safety Design Philosophy for Irong Project | 2014 |
MMC Oil & Gas | PCSB | Thermal Radiation, Gas Dispersion and Plume Study for Temana Revisit Project | 2014 |
RNZ Integrated | PCSB | Baseline Inspection for West Diyarbekir Project, Turkmenistan – (CONSTRUCTION) | 2014 |
MMC Oil & Gas | PCSB | HAZOP & HAZID for Temana Revisit and redevelopment project | 2014 |
AKER Solution | LUNDIN | Studyofcorrosioneffect/mitigationforFPSOandWellheadPlatform forBertam | 2013 |
RNZ Integrated | PC(T)SB | Corrosion Study for GARAGOL DENIZ WEST DEVELOPMENT PROJECT | 2013 |
MMC Oil & Gas | PCSB | HAZOP & HAZID for TGAST Project | 2013 |
RNZ Integrated | PC(T)SB | Mini Hazard Operability Study (HAZOP) for Modification of Gas Outlet of Production Separator for Magtymguly Central Collector Riser Platform A (MCR-A) | 2013 |
RNZ Integrated | PCSB | HAZOP & HAZID for Bokor Phase 3 Infill Project | 2013 |